Solutions /

Terminal Operations

Plan every lift and see your whole terminal. Terminal Operations adds a live yard model to the Smart Cargo Planner — build a digital twin of your inland terminal, watch every container move in 2D and 3D, and let the optimiser decide where each box waits and which machine lifts it.

Live yard visualizer

One geometry, two projections

Your terminal as a single model — seen top-down as a 2D plan, or as a 3D isometric yard. Watch a full day play out: barge and train calls, trucks arriving at the gate, and reach stackers shuttling boxes to their optimal spot.

Illustrative simulation of a 24-hour terminal day — plays automatically. Every container is coloured by status; the ticker narrates what the yard is doing.

⚙ A module of the Smart Cargo Planner New module

The terminal, finally in the plan

Every container has to wait somewhere, and every lift is done by a machine. Terminal Operations answers the two questions an inland terminal asks all day: where should each container wait, and which machine lifts it, and when — so quays and rail tracks clear on schedule and trucks don't queue at the gate.

The Smart Cargo Planner already plans your truck, train and barge movements. Terminal Operations closes the loop at the physical node: barge calls at the quay, rail departure windows and truck gate appointments all land in one live yard model — the missing piece between planning a move and executing it.

Build a digital twin of your terminal over a satellite trace — blocks, reefer racks, roads, quay, rail and gates — then run the yard solver, dispatch work to your reach stackers, and let operators pick up jobs straight from the cab.

A container's journey

Barge crane → waterside buffer → reach stacker to a storage block → a two-day wait → reach stacker to the truck lane. That's three lifts. Put the box straight onto a waiting truck and it's one — the single biggest saving on the yard, and exactly the shortcut the optimiser hunts for.

Value

Why run your yard on it

Fewer wasted moves, an answer even when the day is over-committed, and a cleaner, greener yard.

Fewer lifts, fewer rehandles

Serving a box the normal way takes three lifts; a crane-direct-to-truck move takes one. The optimiser hunts these shortcuts and avoids the costliest move on any yard — digging out a buried container.

It never says "impossible"

When there isn't enough machine time, the planner still returns the best plan — and prices exactly what broke, like "the stacker pool is short between 14:00 and 17:00; a fourth reach stacker fixes it."

Cleaner by design

Electric reach-stacker charging is planned as part of the schedule — shorter driving distances and cheaper, cleaner energy, fully in line with our sustainability focus.

Features

Everything Terminal Operations does

A yard builder, a live operating picture, an optimiser and a mobile flow for the operators — in one module.

  • Yard builder — draw blocks, reefer racks, roads, quay, rail and gates over a satellite trace
  • One geometry, three views — 2D top-down plan, 3D isometric yard and tables
  • Live yard inventory with gate-in auto-positioning
  • Barge & train calls with planned windows and time-slider replay
  • Run the yard solver → an ordered list of planned moves
  • Truck gate appointments feed the plan
  • Twin-lift jobs — two 20ft boxes in a single lift
  • Crew dispatch console — assign a job or leave it open for self-select
  • Equipment-operator mobile flow — pick up, start and complete jobs from the cab
  • Automatic dig-out — a buried box surfaces as a higher-priority restack
  • Driver gate-pass — one code, QR or typed at the kiosk
  • Dangerous-goods rules built in — segregation, inspectable slots, permit ceilings
  • Degassing workflow — dedicated ventilation zone and logged surveyor release
  • Reefer racks and plug capacity
  • Electric reach-stacker charge scheduling
  • Live KPIs — moves, rehandles, utilisation and on-time calls
Under the hood

Three colleagues, one plan

Optimising a whole terminal day at once is intractable, so the engine splits the work into three cooperating layers.

The Allocator

Decides where each container waits over its whole stay — exact, capacity-feasible and explainable, so you always know why a box went to block E.

The Foreman

Turns those placements into real machine routes and exact times — crane sequencing, reach-stacker dispatch and electric charging — in seconds.

The Rehearsal

Replays the whole plan move by move to prove it's physically executable, measures the true KPIs, and is the honest baseline the smart plan has to beat.

Start planning smarter today

See how Waypoint Netherlands can transform the way you manage transport. Bring your challenge — we'll show you the optimized plan.